Reconstructions of the port Koločep

  • Name of the project

    Reconstructions of the port Koločep

  • Construction duration

    Completion of construction works: Commencement date: Septemeber 2020., Completion date: December 2021.

Project details

The works included: Construction of a mooring embankment with a vertical coastal wall 56.0 m long, and for the mooring of the "Vis" type ferry, with a harbor excavation up to the elevation of -4.80 m. In order to create a 56.0 m long mooring embankment, the existing pier was reconstructed by extending it by approx. 31.20 m and widening it by approx. 4.10 m to a total of 11.00 m, • Construction of a 20 m wide ferry ramp with an operational platform measuring 37.0x18.70 m.

  • Reconstructions of the port Koločep
  • Reconstructions of the port Koločep
  • Reconstructions of the port Koločep
  • Reconstructions of the port Koločep
  • Reconstructions of the port Koločep